MESQUITE TRAILS SIDEWALK & DRAINAGE IMPROVEMENT UPDATE
EXTENDED END DATE: SEPTEMBER 2026
The Mesquite Trails Sidewalk and Drainage Improvements project along Camelback Road and Mesa Drive in the Mesquite Trails Subdivision has been extended through September 2026.
As a reminder, here is what the project includes:
• waterline replacement
• installation of new sidewalks streetlights
• construction of drainage ditches and culverts
Here are some NEW items included in the project:
• block walls/wrought iron fences
• installation of riprap for erosion control
Any questions, contact Felicia Curry-Connelly, Drainage and Irrigation Civil Engineer at (480) 208-2404 or email felicia.curryconnelly@srpmic-nsn.gov